Unison
Fit out of 17 flats including partitions, ceilings, acoustic flooring, heating, public health services, lighting, kitchens, bathrooms and flooring.
Berenberg Bank
High quality CAT B fit out over 2 floors. Works included: reception with polished and textured plaster and bespoke joinery throughout, board and meeting rooms, breakout areas, kitchens, high quality toilet areas, Comms room, trading desks and quiet rooms.
89-91 Gresham Street
sq-m2 first completed the phased strip out of this Grade II Listed building before undertaking meticulous restoration and refurbishment to the roof, windows, common parts, external facade & stone work, as well as CAT A reinstatement to 5 floors, and lift and toilet refurbishment works.
55 King William Street
CAT A Reinstatement to 4 Floors including new lift lobbies and toilet refurbishments. Works also included reception and facade refurbishments.
49 Grosvenor Street
Complete restoration of this Grade II listed premises to CAT A office space. Detailed works included: stone & brick restoration, lift refurbishment, plasterwork, toilet installations, Portland entrance stone, overhauled staircase, joinery refurbishment and new M&E Services throughout.
Octopus Publishing
High quality CAT B fit out over the 7th and 8th floors of Endeavour House. The works included reception area, high levels of bespoke joinery, board and meeting rooms, cellular offices, open plan office area, tea point, breakout areas and folding wall and paritions.
IQPC
High quality Cat B fit out over the 1st-through-3rd floors including reception, breakout areas, teapoints, open plan office space, board & meeting rooms and cellular offices
BSO Teaching Centre
Phased CAT B refurbishment over 2 floors. Works comprised of lecture halls, training rooms, locker and shower area, teapoints, office area, toilet and common area refurbishment throughout the building.
Cisco Systems
High quality CAT B fit out which provided open plan and cellular office space, quiet rooms and areas, teapoints, break out areas, reception and display/testing area, Comms room, board and meeting rooms with Cisco Telepresence facilities.
Fishmonger’s Chambers
High quality CAT A fit out to 2 floors of this Scheduled Ancient Monument, A/C and complete plant installation, stone restoration work, disabled access including ramp and lift installation
National Gallery
The works consisted of moving the National Gallery offices from the 2nd floor to the 1st. Phase 1 of the works was striping out the 1st floor from CAT A and fitting out to CAT B whilst replacing windows, open plan and modular office space, meeting rooms, bespoke joinery items, break out area, teapoint, and new toilet and shower rooms. Phase 2 of the works was reverting the 2nd floor back to CAT A for relet.
Dean’s Yard
The works consist of the refurbishment and extension to provide basement staff facilities, ground floor education centre, first and second floor offices and a self-contained flat on the third floor. The works include modifications to the mechanical and electrical services, flooring, external and roof repairs and decorations throughout.
Dewey & LeBoeuf
High quality CAT B fit out and refurbishment over 8 floors including new services, floor, ceilings, extensive joinery, teapoints and breakout areas, providing highly cellularised Legal Offices, lift lobbies and toilet facilities
Finlays Tea
High quality CAT B fit out over the part 1st and 2nd floors for Finlays Tea. Works included bespoke joinery including specialist tea laboratory and research facility, teapoint, open plan office space, meeting and boardroom, cellular offices and high levels of graphic manifestation
BSO Clinical Centre
Shell and Core-to-CAT B fit out of new build development with. Works comprised of new facade curtain walling, reception area, treatment and meeting rooms, locker and shower area, teapoints, office & training areas.
John Swire & Sons
The project comprised of the refurbishment of the main reception to
the ground floor including a new toilet, decorative refurbishment and ceiling replacement to 3rd and 4th floors and decorative refurbishment to parts of 5th floor and both staircases. Within the building, office accommodation was created up to the 4th floor with flats and
boardroom on 5th floor.
Allianz Marine & Aviation
High quality CAT B fit out over 2 floors in‘The Gherkin’ including board & meeting rooms, open plan office areas, trading desks, reception area and bespoke glass and stainless steel staircase
International Bank
CAT B fit out including feature wall, open plan office areas, tea points, comms room, meeting rooms and celluarlised offices
23 Red
High Quality CAT B fit out including: Boardroom, meeting rooms, atrium area, teapoints, toilets & shower, art room, reception, breakout area and open plan office area
Petro Summit
CAT A to CAT B fitout including cellular offices, M&E modifications, teapoint, boardrooms, bespoke joinery, furniture installation and supply and reception area
Global Investor Service
CAT B fit out of existing client space over the 2nd 3rd and 5th floors, including in occupation phased works, basic works included the formation of comms rooms, teapoints, breakout areas, meeting rooms and cellular offices, open plan office areas, bespoke joinery and signage, furniture supply and installation, ceiling alterations and M&E modifications.
European Bank
CAT B fit out with open plan office areas, cellularised offices and meeting rooms,
tea point and breakout area.
ION Trading
High quality CAT B Design & Build fit out comprising of reception area,
meeting rooms, breakout area, bespoke joinery, teapoint, Comms room, shower and toilet facilities, board rooms and including furniture supply and installation.
Tolworth Tower
The works included reverting 10th & 11th floors to CAT A refurbishment
of the 8th floor toilets and kitchen, as well as extensive refurbishment to the Ground floor including installation of Speedlanes, new reception façade & external landscaping works as well as lift lobby refurbishments.
House of Fraser
High quality CAT B fit out over 9 floors. The project comprised new ground floor reception finishes and wall cladding, cellular and open plan office areas to the 1st–to–5th floors and more significant refurbishment to the 6th floor with the introduction of meeting rooms and a café area, and refurbishment to the 7th floor flats.
66 Chiltern Street
The project comprised of the refurbishment of the main reception to the ground floor including a new structural glazed façade, revolving door,
speedgate access control, new stone floor, wall panelling and feature glass artwork.
Duke’s Lodge
High quality residential fitout of Flats 9 & 16. These works include new partitions and ceilings, modifications to the mechanical, public health and electrical services, flooring, tiling, new kitchens, new bathrooms and decorations throughout.
Thornsett Group
Shell & Core to high quality residential fit out of 6 flats and reception area as well as self contained CAT A offices on the street level of Margery Street.
Code London
High quality CAT B fit out including meeting rooms, cellular offices, reception, teapoint, breakout areas, open plan office space, and furniture supply & installation.
Changing Faces
CAT B fit out for this registererd charity. Works included reception, open office area, meeting rooms and cellular office space, teapoint, breakout area, as well as external and common parts refurbishment.
Badenoch & Clark
CAT B fit out. Works included reception, meeting and board rooms, teapoint and breakout areas and services upgrades to accommodate increased occupancy levels.
Alwen Hough Johnson
High quality CAT B fit out. Works included reception, meeting and boardrooms, teapoint and breakout areas








